홈페이지를 방문해주셔서 감사합니다.
시공실적
고객에게 믿음을 주는 글로벌 기업으로 도약하겠습니다.
구 분 | 교량명 | 공사명 | 공사기간 | 규 모 | 발주처 | 비 고 |
---|---|---|---|---|---|---|
2015.12.18. |
B=9.0m |
|||||
2016.03.07. |
B=29.63m |
2016.04.29. |
B=5.0m |
|||
2016.05.11. |
B=5.0m |
2016.06.23. |
B=7.0m |
|||
2016.07.18. |
B=36.0m |
|||||
2016.08.19. |
B=15.0m |
2016.08.26. |
B=4.7m |
|||
2016.12.08. |
B=7.5m |
2016.12.12. |
B=5.0m |
|||
2016.12.19. |
B=6.0m |
|||||
2017.01.20. |
B=7.0m |
2017.03.17. |
B=6.0m |
|||
2017.05.01. |
B=4.6m |
2017.05.02. |
B=6.0m |
|||
2017.05.18. |
B=5.0m |
|||||
2017.06.19. |
B=6.0m |
2017.06.22. |
B=8.0m |
|||
2017.06.26. |
B=7.8m |
2017.06.29. |
B=7.9m |
|||
2017.07.12. |
B=6.0m |
|||||
2017.07.18. |
B=2.5m |
2017.08.03. |
B=10.5m |
|||
2017.09.21. |
B=6.0m |
2017.09.21. |
B=6.0m |
|||
2017.10.12. |
B=6.0m |
|||||
2017.10.17. |
B=6.0m |
2017.10.23. |
B=6.0m |
|||
2017.11.24. |
B=2.4m |
2017.11.24. |
B=6.0m |
|||
2017.11.27. |
B=6.0m |
|||||
2017.11.30. |
B=9.5m |
2017.12.11. |
B=8.0m |
|||
2017.12.13. |
B=7.0m |
2017.12.19. |
B=7.0m |
|||
2017.12.31. |
B=10.0m |
|||||
2018.04.09. |
B=2.5m |
2018.06.19. |
B=5.0m |
|||
2018.06.25. |
B=5.0m |
2018.06.30. |
B=7.0m |
|||
2018.07.18. |
B=3.5m |
|||||
2018.08.06. |
B=12.0m |
2018.08.29. |
B=2.5m |
|||
2018.09.18. |
B=5.5m |
2018.10.05. |
B=3.0m |
|||
2018.10.16. |
B=2.5m |
|||||
2018.10.30. |
B=5.0m |
2018.10.30. |
B=2.5m |
2018.11.22. |
B=9.0m |
2018.11.29. |
B=11.0m |
2018.12.10. |
B=5.0m |
|||||
2019.01.18. |
B=13.0m |
2019.01.22. |
B=10.4m |
|||
2019.03.14. |
B=29.65m |
2019.03.20 |
B=5.0m |
|||
2019.05.13. |
B=10.0m |
|||||
2019.05.15. |
B=6.0m |
2019.05.16. |
B=6.0m |
|||
2019.05.17. |
B=10.0m |
2019.06.03. |
B=8.0m |
|||
2019.06.24. |
B=8.0m |
|||||
2019.06.25. |
B=6.0m |
2019.06.25. |
B=7.5m |
|||
2019.07.26. |
B=6.0m |
2019.08.27. |
B=7.0m |
|||
2019.08.28. |
B=9.0m |
|||||
2019.08.30. |
B=8.0m |
2019.10.11. |
B=6.6m |
|||
2019.11.06. |
B=5.0m |
2019.11.22. |
B=7.0m |
|||
2019.11.22. |
B=10.0m |
|||||
2019.11.27. |
B=17.5m |
2019.12.19 |
B=5.0m |
|||
2019.12.19. |
B=7.0m |
2019.12.26. |
B=10.0m |
|||
2020.05.19. |
B=7.0m |
|||||
2020.05.28. |
B=7.9m |
2020.05.30. |
B=13.9m |
|||
2020.06.10. |
B=20.9m |
2020.06.11. |
B=9.0m |
|||
2020.07.14. |
B=9.0m |
|||||
2020.08.24. |
B=3.5m |
2020.09.01. |
B=5.0m |
|||
2020.09.01. |
B=6.0m |
2020.09.23. |
B=7.0m |
|||
2020.11.11 |
B=4.4m |
|||||
2020.11.24. |
B=6.6m |
2020.11.27. |
B=6.0m |
|||
2020.11.30. |
B=2.5m |
2020.12.04. |
B=10.0m |
|||
2020.12.11. |
B=5.9m |
|||||
2020.12.14 |
B=8.9m |
2020.12.18. |
B=16.49m |
|||
2021.03.17. |
B=12.0m |
2021.03.24. |
B=6.0m |
|||
2021.03.30. |
B=9.0m |
|||||
2021.03.30. |
B=9.9m |
2021.04.13. |
B=3.0m |
|||
2021.05.14. |
B=11.2m |
2021.06.15. |
B=6.0m |
|||
2021.06.22 |
B=7.0m |
|||||
2021.06.25. |
B=2.4m |
2021.06.28. |
B=9.0m |
|||
2021.07.23. |
B=7.5m |
2021.07.26. |
B=7.0m |
|||
2021.09.08 |
B=3.5m |
|||||
2021.10.07. |
B=10.0m |
2021.10.22. |
B=9.0m |
|||
2021.10.22. |
B=7.5m |
2021.10.27. |
B=7.0m |
|||
2021.10.28. |
B=5.6m |
|||||
2021.11.12. |
B=3.9m |
2021.11.25. |
B=3.957m |
|||
2021.11.27. |
B=5.6m |
2021.12.06 |
B=10.5m |
|||
2022.01.27. |
B=10.0m |
|||||
2022.02.26 |
B=5.6m |
2022.05.04 |
B=6.0m |
|||
2022.05.31 |
B=7.0m |
2022.06.24. |
B=16.0m |
(고한 복합문화센터 신축공사 관급자재 강관거더) |
2022.06.24. |
B=3.0m |
2022.06.13. |
B=10.0m |
2022.11.21. |
B=11.0m |
2022.11.22. |
B=11.0m |
2022.12.13. |
2구간:L=1@26.0=26.0m / B=2.5m 6구간:L=1@16.0=16.0m / B=2.5m |
2022.12.14. |
B=6.0m |
2022.12.15. |
B=4.9m |
2022.12.19. |
B=10.65m |
2022.12.22. |
B=8.0m |
2022.12.22. |
B=5.0m |
2023.03.15. |
B=5.0m |
2023.05.11. |
B=4.9m |
2023.05.11. |
B=4.9m |
2023.05.26. |
B=5.0m |
2023.05.26. |
B=9.5m |
2023.05.31. |
B=8.0m |
2023.06.16. |
B=9.5m |
2023.06.23. |
B=13.0m |
2023.06.26. |
B=20.0m |
2023.06.26. |
B=9.0m |
2023.06.27. |
B=19.0m |
2023.06.29. |
B=6.0m |
2023.07.31. |
B=9.5m |
도로관리사업소 |
2023.09.21. |
B=5.0m |
2023.09.21. |
B=5.0m |
2023.09.22. |
B=5.0m |
2023.09.25. |
B=6.0m |
2023.10.16. |
B=10.0m |
2023.11.29. |
B=11.0m |
2023.12.01. |
B=12.0m |
(DSP 거더 제작 및 설치) |
2023.12.07. |
B=5.5m |
2023.12.12. |
B=7.5m |
2023.12.14. |
B=8.0m |
2023.12.20. |
B=11.75m |
2024.03.04. |
B=7.5m |
2024.05.14. |
B=9.0m |
2024.05.31. |
B=6.43m |
2024.06.07. |
B=7.5m |
2024.06.12. |
B=5.00m |
2024.06.19. |
B=11.0m |
2024.06.26. |
B=8.0m |
2024.06.26. |
B=10.5m |
2024.06.27. |
B=6.5m |
2024.07.07. |
B=4.0m |
2024.09.26. |
B=8.0m |
2024.11.22. |
B=8.0m |
2024.11.30. |
B=6.0m |
2024.12.03. |
B=3.0~7.0m |
2024.12.04. |
B=12.00m |
2024.12.10. |
B=26.0m |
2024.12.10. |
B=8.4m |
22024.12.11. |
B=6.0m |
2024.12.11. |
B=10.0m |
2024.12.11. |
B=11.00m |
2024.12.11. |
B=11.0m |
2024.12.16. |
B=6.0m |
2024.12.17. |
B=8.0m |
2024.12.17. |
B = 9.0m |
2024.12.19. |
B=8.0m |
2025.01.13. |
B=6.0m |